Downloads
Photo 1: Tyalgum Road contract
Caption: Local company SEE Civil Pty Ltd has been awarded a $16 million contract to repair the Tyalgum Road landslip. Making the announcement on site today are (from left) SEE Civil Construction Manager Rob Blyth, Council's Director Engineering David Oxenham, Mayor Chris Cherry and DIscover Tyalgum's Brad Sims.
Photo 2: Tyalgum Road landslip cracks
Caption: Huge cracks formed along a 100 metre section of Tyalgum Road following a landslip on 28 February 2022, forcing the road to shut.
Photo 3: Tyalgum Road landslip aerial
Caption: An aerial image taken of the Tyalgum Road landslip on 1 March 2022 - the day after the flood. This image shows the extent of the landslip - from the slope above the road down to the Oxley River below.