$330M Eurobodalla Hospital Construction Underway

NSW Gov

A large mobile crane has arrived on site to support the construction of the new $330 million Eurobodalla Regional Hospital.

The crane's arrival marks an important step in delivering a sustainable, modern and purpose-built hospital to support the needs of the Eurobodalla Shire community from Narooma to Batemans Bay.

With a maximum height of just over 70 metres, the crawler crane can lift up to 110 tonnes and will be used to carry a range of heavy building materials required for construction of the new hospital.

Unlike a traditional tower crane, which is fixed in place, a crawler crane moves on tracks, allowing greater flexibility around the building site.

The crawler crane will enable efficient access and movement of materials across the large footprint of the new Eurobodalla Regional Hospital site.

Local students are invited to take part in a competition to help name the crane. The winner of the Name the Crane competition will have their winning name displayed on the crane. Prizes are also available for runners up.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.