Barry Way, Moonbah Roadworks Set for March 3, 2025

Grosses Plain Creek Bridge on Barry Way, Moonbah seen from the side

Residents and motorists are advised that roadworks are scheduled to commence from Monday 3 March 2025 on Barry Way in Moonbah, either side of Grosses Plain Creek Bridge, weather permitting.

The scheduled works will see crews performing maintenance on the road seal of the sections of Barry Way approaching Grosses Plain Creek Bridge.

Roadworks traffic control measures will be in place. Motorists are advised to expect delays during this maintenance work, and to follow all signs, speed limits and traffic controller directions. Local residents will have access to their properties at all times, subject to a delay of up to 10 minutes.

All work is expected to be complete by Monday 17 March 2025. This schedule is subject to change in the event of poor weather or other unforeseen circumstances.

Essential Information

Start date:

Monday 3 March 2025, weather permitting

Location:

Grosses Plain Creek Bridge

Barry Way, Moonbah

Duration:Two weeks, weather permitting
Reason:Maintenance of bridge approach road seal

View a map of the works locations online at https://qrco.de/GrossesPlainCkWorks.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.