Barwon Water will be carrying out sewer main maintenance work within a section of the Bellarine Rail Trail on Friday 26 August 2022.
Work will take place between 9am and 12.30pm.
As part of this work:
- Traffic management will be in place for pedestrians and cyclists;
- A 1.5 km section of the rail trail will be closed while the work takes place;
- There may be increased noise and dust from trucks and construction, although Barwon Water will aim to minimise impacts to local residents;
- Barwon Water will reinstate the area upon completion of works, ensuring it is left in good condition, and
- There will be no interruptions to water or sewerage services during the work.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.