Image: Maksym Kozlenko, CC BY-SA 3.0
Residents and motorists are advised that road stabilisation works in Bredbo are scheduled to commence from Monday 17 February 2025, weather permitting.
The scheduled works will improve the road base and reduce the need for future maintenance in two locations, at the intersection of Monaro Highway and Braidwood Street (sign-posted as Jerangle Road), and at the gravel pull-over area off Monaro Highway opposite Bredbo Centennial Park.
All work is expected to be complete by Monday 3 March 2025. This schedule is subject to change in the event of poor weather or other unforeseen circumstances.
Essential Information |
||
Start date: |
Monday 17 February 2025, weather permitting | |
Location: | Bredbo, two sites:
|
|
Duration: | One to two weeks, weather permitting | |
Reason: | Road stabilisation to improve road base and reduce required future maintenance frequency |
View a map of the works locations online at https://qrco.de/BredboFebRW, or at the bottom of this page.
Roadworks traffic control measures will be in place. Motorists are advised to follow all signs, speed limits and traffic controller directions. Local residents will have access to their properties at all times, subject to a delay of up to 10 minutes.