Public Services and Procurement Canada (PSPC) wishes to advise users of a full overnight closure on the Burlington Canal Lift Bridge for the production of a motion picture during the following period:
- From Thursday, January 30, at 6 pm, to Friday, January 31, at 7 am
During this period, no vehicular or pedestrian traffic will be allowed across the bridge. Travellers are encouraged to use alternative routes, such as the Burlington Skyway Bridge .
The schedule may change depending on weather conditions. PSPC will issue a revised public notice in the event of any schedule changes.
PSPC thanks users for their patience.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.