Clifton Springs boat harbour is relatively shallow, particularly after storms when sand and seagrass are deposited in the area.
Dredging to clear the harbour channels near the entrance is scheduled to occur between 3-7 April 2023.
In the meantime, vessel users are asked to take extra care.
At tide levels below 0.4 metres, it may be difficult for vessels with deeper drafts to enter or leave the harbour without grounding.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.