Drysdale Drainage Upgrade to Cut Flash Flood Risk

The City of Greater Geelong has recently delivered a large drainage upgrade project in a low-lying part of Drysdale, significantly reducing the impact of flash flooding to nearby residents.

Completed in July after three months of construction, the works addressed a longstanding issue at a trapped low point in Barrands Lane, which increased the flood risk for neighbouring properties.

This risk became particularly evident during heavy rainfalls, including Victoria's wettest month on record in October 2022.

To mitigate flood risk, new drainage pipes were installed to improve the flow of stormwater from Barrands Lane into an existing pipe in Wyndham Street.

Additionally, new drainage pits were installed, existing pits were upgraded to increase capacity, and a section of Barrands Lane was raised to optimise stormwater flows.

Mayor Trent Sullivan

This upgrade has been a significant undertaking for our engineers and City workers, from design to completion.

Flooding is a major concern that can leave impacted residents very vulnerable, so this is a great outcome and will hopefully give nearby residents some peace of mind.

Councillor Jim Mason

I want to thank the residents in this area who have endured drainage issues for many years; their patience and continued advocacy is really appreciated.

Events like the once-in-a-generation rainfall of 2022 have shown how important it is to continually strengthen our stormwater services in order to keep residents and their properties safe.

The City thanks residents for their patience and understanding throughout the construction phase.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.