Eagle Mountain Mining Limited (ASX:EM2) ("Eagle Mountain", the "Company") is pleased to
provide an update of exploration activities, at the Company's 80% owned Oracle Ridge Copper
Project ("Oracle Ridge", the "Project") in Arizona, USA.
Drilling Recommences at Oracle Ridge
Drilling recommenced at Oracle Ridge on Monday, 11 January 2021 after a scheduled
Christmas break.
The first drill hole for 2021 is WT-21-01 and was completed last week. WT-21-02 is underway.
All drilling undertaken in 2020 was aimed at expanding the existing mineral resource base.
Assays received from the 2020 drilling contained significant grades of copper mineralisation.
Assays for the last five drillholes are pending.
Eagle Mountain remains confident in achieving its previously announced Exploration Target of
adding an additional 14-29Mt
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).