Flood restoration works to start at Kyogle Road

Tweed Shire Council

Downloads

Photo 1: Kyogle Road barriers

Caption: Motorists are urged to note changed road conditions along Kyogle Road as semi-permanent barriers are erected ensuring single-lane access through works sites.

Photo 2: Turn to Mt Warning Road

Caption: The turn-off to Mount Warning Road where CMC's works depot is being established.

Photo 3: Kygogle Road aerial flood 2022

Caption: An aerial shot taken above Kyogle Road in the days after the February 2022 flood shows the road crumbling into the Tweed River.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.