Sections of footpath along Lava and Kepler streets will be renewed over August and September.
The south side of Lava Street between Liebig and Fairy streets will be renewed along with the footpath on both sides of Kepler Street between Raglan Parade and Lava Street.
Work will begin on Monday, August 5.
Footpath fencing and pedestrian detours will be in place.
Road speed reductions will also be introduced while the work is under way and minor delays may be experienced while trucks enter and exit work sites.
Access to businesses will be available.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.