Decision letter and Inspector's Report for a called-in application for the installation of a solar farm and battery storage facility with associated infrastructure.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.