On 15 August 2024, we issued a notice of our intent to enter into a three-year lease with the Spark Consortium for the property part 2-14 Websters Road, Templestowe.
A notice was placed on our website and at the location, outlining the terms and conditions of the proposed lease and inviting submissions until 16 September 2024. During this consultation period, no submissions were received.
As a result, we will now proceed with granting the lease to the Spark Consortium under the terms and conditions set out in the original notice. The leased property will be used for the storage of trucks and materials for the North East Link Project.
The consortium, trading as "SPARK NEL DC JV" (ABN 94 762 343 962), consists of the following members:
- WeBuild
- GS Engineering and Construction
- CPB Contractors
- China Construction Oceania
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.