Molong Town Centre Activation Project Enters Stage 2, Phase 2

MicrosoftTeams-image (12).png

Stage 2, Phase 2 of the Town Centre Activation Plan has been completed. This concludes the main street component of the project, with a final seal and line marking to occur in spring.

The Gasworks Lane area component continues with footpath and kerb installation, road works and sealing and linemarking.

Access to the Gasworks Lane carpark will be fully closed from Monday 27 May at 7am until Thursday 30 May to undertake the required works. This closure will result with no access to the back carparks of the Telegraph Hotel and the Molong Pharmacy for this period of time. This is due to the excavations work required and stablising works for the sealing. Traffic movement during these works may further damage the road, taking longer to prepare. The site is expected to reopen on Thursday, 30 May 2024.

The IGA carpark will be unaffected by the works and will remain fully open.

The site is expected to be completed by late June 2024.

gasworks lane closure.PNG
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.