Works to install the highly-anticipated brand new playground at Jack Gow Reserve in McGraths Hill are now underway.
The new playground on Andrew Thompson Drive was designed following community consultation to ensure the space meets the current and ongoing needs of the community.
The new playground will include a climbing tower with slides, seated and nest swings, ground-level trampoline, see-saw, spinner and play cubby/charging station - which will front a new riding/walking path.
There will also be a picnic table, benches and seating options, bins and landscaping. Shade sails will also be installed, covering the play and seating spaces.
Construction is targeted to be completed on 20 December 2024, weather permitting.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.