Council is replacing McDonalds Bridge over Godfreys Creek in Gobur (8km north of Yarck on Yarck-Euroa Road).
Works are scheduled to commence from 28 March and will involve the construction of a new two-lane concrete bridge, followed by demolition and removal of the existing single-lane bridge.
Construction is expected to take 8 weeks and the existing bridge will remain open with reduced speed limits until works are complete. Traffic delays for vehicles will be minimal.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.