Road Upgrades Underway In Timmallallie National Park

Road repairs and upgrades are underway on several creek crossings in Timmallallie National Park to improve access for staff, visitors and emergency services after significant rainfall or during fires.

Timallallie National Park Community Conservation Area Zone 1

Eight new concrete causeways will be constructed between Monday 22 July and Saturday 31 August to replace flood-damaged infrastructure and ensure they are more resilient for future flood events.

The following roads will be impacted by closures during the works:

  • Top Crossing at Dandry Creek south of Dandry Gorge (Sculptures in the Scrub will remain open via Top Crossing Rd)
  • Gibbican Road
  • County Line Rd between Burma Rd and Sunday Rd
  • Rocky Rd between Mistletoe Rd and Sunday Rd
  • Rocky Rd between No.1 Break Rd and Gibbican Rd
  • No.1 Break Rd between Rocky Rd and Newell Highway

Roads will be closed for up to 4 days at each causeway to allow for construction and concrete curing time. Road closures may impact travel times.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.