Work on King Street, Gloucester has commenced and is expected to be completed late September, weather permitting.
The work includes a reconstruction of the road surface to improve safety, provide a smoother travelling surface and reduce ongoing maintenance costs.
Road users can expect partial road closures between Church Street and Barrington Street for the duration of the work.
The site crew will assist residents and business owners to access their properties at all times.
Please slow down around the roadworks and follow directions from traffic controllers.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.