Concept designs for a new amenities building to replace the existing public toilets at the Seacliff foreshore features more toilets, change rooms with lockers, and outdoor public showers.
The proposed new building would be located on the same level as the footpath and the concept design includes:
- 5 unisex toilets
- 1 disability toilet and shower
- outdoor public shower area and handwashing station
- re-harvesting of rainwater
- solar panels
An important aspect of the project would be an upgrade of the area surrounding the new amenities building, which will create continuous widened footpaths with more circulation space to improve access to the amenities area and beach for people with disabilities.
This engagement starts on 17 February and closes 5pm, 10 March 2022.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.