Downloads
Photo 1: Pump station announcement
Caption: Announcing the start of work on the new stormwater pump station behind Brothers Leagues Club at Murwillumbah are from left: Brothers Leagues Club Manager David Orr, Justine Elliot MP, Janelle Saffin MP, Mayor Chris Cherry and Brothers Board Member Glenn Weaver.
Photo 2: Engineer Project Team
Caption: The project team responsible for delivering the new pump station are from left, Mitch Jackson, Leon McLean, TSC Director Engineering David Oxenham, RA Program Director Geoff Waterhouse and Ethan Crowe.
Photo 3: Brothers Leagues Club 2022 flood
Caption: An aerial view of Murwillumbah Brothers Leagues Club after the 2022 flood. The flood pump will be built beside the levee, seen above the floodwater at the bottom left of the photo.