MidCoast Council
Curb and guttering work will take place on Princes Street, in between George and Denison Streets Cundletown, in early March.
The work being carried out will see approximately 160 metres of curb and guttering done in preparation for further asphalt work in the area in the future.
Motorists are cautioned that there will be a change to traffic conditions at certain times. During peak hours 6.30am to 10am both lanes will remain in operation with reduced speeds.
During the non-peak hours of 10am to 2pm the road will be reduced to one lane under traffic controllers.
Residents in the immediate area are also asked to not park in the parking lanes during work hours. The lanes will be sectioned off each day to ensure the work can take place.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.