The Corduroy along Crescent Head Road has seen a great deal of damage as a result of the recent flooding.
This damage is the result of prolonged flooding and the movement of traffic along the road while the pavement was saturated.
The road requires immediate restoration works to ensure public safety and prevent further damage to the pavement. These emergency works are planned to commence this coming Sunday, 11 April.
We apologise in advance for any inconvenience the works may cause residents and other travellers along this section of road.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.